- Home
- Government
- Engineer
- Development Regulations and Design Standards
Development Regulations and Design Standards
Greene County Subdivision Regulations:
Greene County Subdivision Regulations - https://www.greenecountyohio.gov/312/Major-Subdivisions
Greene County Construction Standards - https://www.greenecountyohio.gov/312/Major-Subdivisions
Greene County Typical Roadway Sections-attachment
Greene County Street Design Standards - https://www.greenecountyohio.gov/312/Major-Subdivisions
Greene County Access Requirements-attachment
Greene County Access Management-Coming soon
Greene County Engineer Checklists
Improvement Plan Checklist-attachment
Construction Cost Estimate Checklist
Final Plan Checklist-attachment
Construction Checklist-attachment
Greene County Bond Price List:
2022 Accepted Bond Price List
https://engineer.mcohio.org/wp-content/uploads/2022/02/2022-Accepted-Bond-Price-List.pdf
Note Greene County uses the Montgomery County Accepted Bond Price List
Greene County Surety Bond Releases:
Application for Surety Bond Release- Streets and Stormsewer PDF
Sample Final Engineer's Certificate- Streets and Stormsewer PDF
Application for Surety Bond Release- Sidewalks and Survey Markers PDF
Sample Final Engineer's Certificate- Sidewalks PDF
Sample Final Surveyor's Certificate- Survey Markers PDF
General Permit for Construction Activities
The NPDES Phase II rule requires construction sites disturbing equal to or greater than one acre and less than five acres to control pollutants in stormwater runoff. Construction activity disturbing less than one acre requires a permit if it is part of a larger common plan of development or sale disturbing a total of one acre or greater, or is individually designated for permit coverage by the NPDES permitting authority.
Stormwater Regulations and Forms-- https://www.greenecountyohio.gov/1786/Greene-County-Stormwater