Development Regulations and Design Standards

Greene County Subdivision Regulations:

  Greene County Subdivision Regulations - https://www.greenecountyohio.gov/312/Major-Subdivisions

Greene County Construction Standards - https://www.greenecountyohio.gov/312/Major-Subdivisions

Greene County Typical Roadway Sections-attachment

Greene County Street Design Standards - https://www.greenecountyohio.gov/312/Major-Subdivisions

Greene County Access Requirements-attachment

Greene County Access Management-Coming soon

 

Greene County Engineer Checklists

               Preliminary Plan Checklist

               Improvement Plan Checklist-attachment

               Construction Cost Estimate Checklist

               Final Plan Checklist-attachment

               Construction Checklist-attachment

              

Greene County Bond Price List:

       2022 Accepted Bond Price List

 https://engineer.mcohio.org/wp-content/uploads/2022/02/2022-Accepted-Bond-Price-List.pdf

     Note Greene County uses the Montgomery County Accepted Bond Price List


Greene County Surety Bond Releases:

Application for Surety Bond Release- Streets and Stormsewer PDF
Sample Final Engineer's Certificate- Streets and Stormsewer PDF
Application for Surety Bond Release- Sidewalks and Survey Markers PDF
Sample Final Engineer's Certificate- Sidewalks PDF
Sample Final Surveyor's Certificate- Survey Markers PDF

 

General Permit for Construction Activities

The NPDES Phase II rule requires construction sites disturbing equal to or greater than one acre and less than five acres to control pollutants in stormwater runoff. Construction activity disturbing less than one acre requires a permit if it is part of a larger common plan of development or sale disturbing a total of one acre or greater, or is individually designated for permit coverage by the NPDES permitting authority.

Stormwater Regulations and Forms-- https://www.greenecountyohio.gov/1786/Greene-County-Stormwater